Bathroom Renovation –
Full Remodel (Two Bathrooms)
- Project: Two-Bathroom Remodel
- Location: Tri-Cities, TN
- Type: Interior Residential Renovation
- Completion: September 2024
- Duration: 2–4 weeks
- Client Type: Homeowner
From Dated and Cramped to Modern and Functional
These two bathrooms were no longer working for the homeowners — visually or practically. The layouts felt crowded, the fixtures were outdated, and the finishes didn’t match the rest of the home.
We took both spaces down to the studs and built them back up from scratch, with new surfaces, lighting, storage, and plumbing fixtures that feel cohesive and clean. Each bathroom was fully rewired, re-plumbed, retiled, and customized to meet the client’s preferences while keeping things efficient and code-compliant.
Scope of Work
Full demolition of both bathrooms down to framing
New subfloor and moisture barrier installed
All new plumbing lines and drainage connected to existing supply
Electrical wiring upgraded to support new lighting, outlets, and electric mirrors
Installed custom vanities, cabinets, and countertops
Built new walk-in tile showers with waterproof membranes
Installed flooring, paint, trim, and finish fixtures in both spaces
Final walkthrough and site cleanup included
Estimated Labor Range
This was a full remodel of two bathrooms, completed by our in-house team.
Estimated Labor Cost: $10,000 – $20,000
Final cost included full demo, rough-in, rebuild, and finish work.
Materials (tile, vanities, mirrors, fixtures) were selected by the client with our input.
Timeline
Duration: 2–4 weeks
Work was completed on time, with one bathroom fully finished before the second was started to minimize disruption.
Two Bathrooms. One Remodel Plan.
If your home’s bathrooms are ready for a full update, we’ll walk through what’s possible — and give you a clear plan that covers layout, labor, and finishes.